The deployment proposed by the project on hand is 550 km long, linking the Adriatic Sea to the internal Bohemian Massif. In the frame of this project is planned the installation of 8 stations as part of a pool of 55 stations gathered together with ETH Zürich and IG-CAS Prague.
Further information on EASI project can be found in the following link